Installation

How acoustic installation works

Design specifies what has to happen; installation is where it does. Panels, baffles and pods are fitted to the approved drawings and specification, with positions, fixings and tolerances checked, because a panel out of place changes the acoustics the design was built to deliver.

Our own engineers do the fitting, so there is no handoff between the people who supply the product and the people who fix it. Logistics and protection are planned before the first panel goes up, and where the space is occupied we phase the work or run it out of hours. We leave the site clean at the end of each day, and any change from the approved drawings is agreed with you first.

Close-up of an acoustic wall panel ready for installation

What sets our approach apart

Every recommendation is backed by data, not guesswork — from the first measurement to the final sign-off.

One contractor, start to finish

Survey, design, installation and testing all handled in-house — no subcontractors, no handoffs between suppliers. One team stays accountable for the result, from the first site visit to the final sign-off.

Designed to a target

Every space gets an acoustic design modelled to a specific reverberation target, not a standard panel layout. Before-and-after measurement is available as an option, so the improvement can be proven, not just felt.

Independent on materials

We source from several manufacturers and are tied to none, so we specify what your space and budget actually need, not what one catalogue stocks.

Every recommendation backed by data

When measurement is added, reverberation, noise and speech clarity are measured with calibrated equipment, not estimated, so you get numbers rather than an opinion.

Clear reporting, every time

Surveys and tests end with a written report of findings and recommendations that goes straight into the building file, not a verbal opinion.

No pressure to buy

Surveys and advice come with no obligation to proceed. If a space doesn't need treatment, or needs less than you thought, we'll tell you.

Acoustic panels being fitted on site
Process

Scope of acoustic installation

Every installation follows the approved drawings, from logistics through to final sign-off.

Drawings and specification

Architectural drawings are turned into fixing details before a single panel is cut.

Site logistics and protection

Deliveries, protection and programme are coordinated so the build stays on track.

Supplied from our Acoustic Solutions

Panels, baffles and pods come from our range through the same team that fits them, so nothing is handed between contractors.

Explore Acoustic Solutions

Fitting by our engineers

Our own engineers fit to exact tolerances, checking positions and fixings for performance and a clean finish.

Process

One contractor from first measurement to final sign-off

We work in a strict sequence. Each stage is verified before the next one begins.

Site Survey & Assessment

We listen to the problem and understand the space. You tell us what you hear and when it matters most.

Close-up of an acoustic wall panel ready for installation

Design & Quotation

An engineer visits the site and assesses the reverberation, noise transfer and how the space is used. You receive clear recommendations.

Acoustic surveyors assessing a room on site

Supply &
Install

We specify the correct materials and plan the work around your operation. Nothing is left to chance.

Engineer measuring sound levels with a calibrated meter

Testing & Compliance

We fit the treatment cleanly with minimal disruption. Before-and-after measurement is available as an option.

Trusted on schools, venues and landmark halls

Acoustic panel installation FAQs: process, access and aftercare

Straight answers about how acoustic panel supply and installation works.

Will acoustic panel installation disrupt our business?

We plan around your operating hours, including out-of-hours or phased work where needed, and leave the site clean at the end of each day. Access, noisy tasks and protected areas are agreed with you beforehand, so your staff, customers or pupils can carry on as normally as possible.

Who installs the acoustic panels?

Our own acoustic engineers fit the panels, baffles and pods, the same team that supplied them, so nothing is handed between contractors. Electrical work for items such as acoustic lighting is carried out by a qualified electrician as part of the same job.

Do you supply and install acoustic panels?

Yes. Supply and installation are handled by the same in-house team, so nothing gets lost between a supplier and a fitter. We specify the product, order it from the manufacturer, manage delivery and fit it to the approved drawings.

How long does acoustic panel installation take?

It depends on the room, the products and how much access we have. A single room takes far less time than a large hall or a phased, occupied floor. We confirm the programme once the design is finalised, so there are no surprises on site.

Do you clear up and remove waste afterwards?

Yes. Site protection, cleaning up and waste removal are part of the job, not an extra. Floors and fittings are protected while we work, we agree waste routes with your site team, and the space is left clean and ready to use when we finish.

Can acoustic panels be fitted to any wall or ceiling?

Almost any, but the fixing method depends on the surface. Plasterboard, block, concrete, timber and suspended ceilings each need a different approach, and load limits matter for heavier products. We confirm the wall or ceiling type and its capacity during survey and design, before anything is ordered.

What happens once installation is finished?

We check the work against the approved drawings and specification, walk the space with you and deal with any snagging. We can also test the finished room, so you have measured before-and-after results to keep on file.

Find out what your room needs

Book a free site survey or talk to an acoustician. We'll tell you what your room needs.