Acoustic Testing & Compliance

Measured before, measured after

We measure again. Post-installation testing confirms the room performs as designed, and you receive the record.

Engineer measuring sound levels with a calibrated meter

Measured before, measured after: the improvement shown in numbers

Tested to BB93 and Approved Document E where they apply

Independent testing available for spaces we did not supply

A written record that goes straight into the building file

Verification

How acoustic testing works

Testing measures the finished room, covering reverberation time, ambient noise and speech clarity, and sets the results against the original survey. The improvement becomes a number you can point to, not an impression.

Where a standard applies, the report is written against it: Approved Document E, BB93 for schools or the relevant British Standard. We also test spaces we didn't treat, so you can get an independent record for the building file whoever did the work. If the room falls short of its target, the report says so plainly, with the figures.

Engineer measuring sound levels with a calibrated meter

What sets our approach apart

Every recommendation is backed by data, not guesswork — from the first measurement to the final sign-off.

One contractor, start to finish

Survey, design, installation and testing all handled in-house — no subcontractors, no handoffs between suppliers. One team stays accountable for the result, from the first site visit to the final sign-off.

Designed to a target

Every space gets an acoustic design modelled to a specific reverberation target, not a standard panel layout. Before-and-after measurement is available as an option, so the improvement can be proven, not just felt.

Independent on materials

We source from several manufacturers and are tied to none, so we specify what your space and budget actually need, not what one catalogue stocks.

Every recommendation backed by data

When measurement is added, reverberation, noise and speech clarity are measured with calibrated equipment, not estimated, so you get numbers rather than an opinion.

Clear reporting, every time

Surveys and tests end with a written report of findings and recommendations that goes straight into the building file, not a verbal opinion.

No pressure to buy

Surveys and advice come with no obligation to proceed. If a space doesn't need treatment, or needs less than you thought, we'll tell you.

Technician measuring acoustics in a classroom
Proof

Scope of acoustic testing

Results are set against the original survey, so before and after can be compared directly.

Before and after

Survey data is compared with post-installation results to show whether the improvement is real and measurable.

Standards check

Results are reported against Approved Document E, BB93 for schools or the relevant British Standard where they apply.

Matched to our Acoustic Solutions

If a room falls short of its target, added or adjusted treatment can be specified from our range.

Explore Acoustic Solutions

Written record

A written report of the measured results goes straight into the building file, for spaces we treated and spaces we did not.

Process

One contractor from first measurement to final sign-off

We work in a strict sequence. Each stage is verified before the next one begins.

Site Survey & Assessment

We listen to the problem and understand the space. You tell us what you hear and when it matters most.

Close-up of an acoustic wall panel ready for installation

Design & Quotation

An engineer visits the site and assesses the reverberation, noise transfer and how the space is used. You receive clear recommendations.

Acoustic surveyors assessing a room on site

Supply &
Install

We specify the correct materials and plan the work around your operation. Nothing is left to chance.

Engineer measuring sound levels with a calibrated meter

Testing & Compliance

We fit the treatment cleanly with minimal disruption. Before-and-after measurement is available as an option.

Trusted on schools, venues and landmark halls

Acoustic testing and compliance FAQs: reports, standards and re-testing

Straight answers about acoustic testing, reports and building control.

Can you acoustically test a room that someone else treated?

Yes. We provide independent testing for spaces treated by other contractors, and we measure and report in the same way whoever did the work. That gives you a neutral record of how the room performs against its target.

What is included in an acoustic test report?

Measured reverberation time, ambient noise and speech clarity figures, compared against the original survey where we have one, written up as a record for the building file. The report states the standard or target used and the measurement conditions, so the results can be checked.

Can you test to Approved Document E and BB93?

We test and report against BB93 for schools and the relevant British Standards, and can measure against Approved Document E figures. Statutory pre-completion testing under Part E is normally carried out by a UKAS-accredited body, so we confirm the testing route with your building control officer before we start.

When should acoustic testing be done after installation?

Once the fit-out is finished and the room is in its normal condition, with furniture in place and services running. Testing an unfinished room gives misleading results, so we agree the timing with you and the main contractor.

Will building control accept the test report?

The report gives building control and planners clear, measured evidence against the standard that applies. Acceptance is their decision, and some requirements, such as Part E pre-completion testing, call for an accredited tester, so we agree the standard, the format and the testing route with you at the start.

What is the difference between an acoustic survey and acoustic testing?

A survey happens before the work: it measures the room and sets the target. Testing happens after: it measures again and compares the result with that baseline. Together they show whether the treatment did what it was specified to do, and give you evidence to keep on file.

What happens if the room doesn't meet its target?

The report shows where the room falls short and by how much, so the remedy, usually added or adjusted treatment, is specified against a number rather than a guess. After the fix we retest, so you have a record showing that the room now meets its target.

Find out what your room needs

Book a free site survey or talk to an acoustician. We'll tell you what your room needs.

Acoustically treated interior showroom space