Maputo Private College Auditorium

A 380-seat multi-purpose conference hall for a new education campus in Maputo, Mozambique, delivered as a turnkey design and installation project in 40 days. Geometric diamond-form acoustic timber panelling lines the ceiling and walls, paired with a high-efficiency professional sound system tuned to the hall's multi-purpose use.

Project

MP Conference Hall

Location

Maputo / Mozambique

Client

PRIVATE EDUCATION INSTITUTE

Capacity

380

Completed

July 22, 2025

Space

Auditoriums & Theatres

Image Gallery

No items found.

A new education campus in Mozambique needed a multi-purpose conference hall delivered on a turnkey programme.

This new education campus in Maputo, Mozambique needed a multi-purpose conference hall. The client asked for turnkey delivery, with every element of the interior specified and designed by Acoustic Design.

Working with local teams on the ground, we completed the full scope, from design through to installation, in 40 days.

The 380-seat hall combines acoustic timber panelling with a professional sound system tuned to its multi-purpose use.

Challenge

A new education campus in Mozambique needed a multi-purpose conference hall delivered on a turnkey programme.

A new campus needed a multi-purpose conference hall, delivered turnkey. Design development had to cover both the quantitative and qualitative aspects of the brief, with every element of the interior specified and designed by Acoustic Design.

Solution

A full turnkey scope - design, geometric diamond-form acoustic timber panelling and a high-efficiency professional sound system - was delivered with local teams in 40 days.

Working with local teams on the ground, we delivered the full turnkey scope, from design through to installation, in 40 days.

Geometric diamond-form acoustic timber panelling lines the ceiling and walls, for both a distinctive look and high-quality acoustic performance. The room's architectural acoustics were matched with a high-efficiency professional sound system tuned for the hall's multi-purpose use.

Outcomes

A 380-seat multi-purpose conference hall, delivered turnkey in 40 days.

The 380-seat hall was completed in 40 days, combining acoustic timber panelling with a professional sound system for multi-purpose use.

From first survey to final finish

One team handles all seven stages, the same way on every project, so you always know what happens next.

Acoustic Survey

A surveyor visits the site, or works from your drawings and photos when a visit isn't practical. Either way, the room, its surfaces and how it is used are recorded before any advice is given.

Acoustic Assessment

Reverberation, ambient noise and noise transfer are read against what the space is used for. The findings arrive as a written report with recommendations, yours to keep with no obligation to proceed.

Acoustic Design

Treatment is modelled against a reverberation target, then drawn up with panel positions, fixings and finishes. Nothing moves forward until you have approved the design.

Specification & Quotation

Every quotation comes with the specification behind it, listing products by type, quantity and finish with costs set out line by line. What is quoted is what the design calls for.

Acoustic Product Supply

Panels, baffles, ceilings and screens come from our Acoustic Solutions range and are supplied to the approved specification. What arrives on site matches what was designed.

Acoustic Installation

Our own engineers fit to the approved drawings, checking positions and fixings as they go. One team supplies and installs, so nothing is handed between contractors.

Acoustic Testing & Compliance

Optional: after fit-out the space can be measured again and compared with the original survey, so the improvement is measured rather than assumed. Results are reported against the relevant standards and the written record goes into your building file.